About Project
Our client is one the biggest consumer goods manufacturer in the world. The fire system they were using date back to year 1999. Mostly the system is damaged and definitely not fit for protection from any kind of Fire Hazard.
Our Client’s Challenge
The system was big and during the course of time, various parts have been changed that can work perfectly when used alone. Client wishes a solution with minimum economical burden on Infra cost.
Also, there is a lot of civil work associated in demolishing the underground Pump House and then re constructing them.
Also, there is a lot of civil work associated in demolishing the underground Pump House and then re constructing them.
Our Approach And Solution
Audit of current system was done. Testing & Performance analysis was done through various Tools & machineries. We prepared a detailed BOQ which includes the list of material which can be used for next 5 years and which cannot be used.
- Testing & Analysis
- Design Changes
- Detailed BOQ
- Civil Work
- Availability of Fire truck during de-installation and Re-installation
- Activity wise work flow chart
- Delivery of Project in record time.